MTM Cincinnati – Getting Close To The Top At Queen City Square November 2, 2009
Posted by eviljwinter in Cincinnati, My Town Mondays.Tags: Queen City Square
trackback
Maybe another six weeks or so and they’ll have reached the top floor. They are already building out the lower stories to Fourth Street and installing the glass facade on below the tenth floor.

More posts at the My Town Mondays blog.
Ack. That looks scary. I cannot imagine working on a construction site like that!
I’m with Barrie, I never understand how they get those huge buildings put together. It’s not like Leggo!